The main question that customers often ask is about the lead time to manufacture the tooling. In the time when speed and quality are the main factors of success, such question is very justified

The lead time to manufacture the tooling varies depending on the complexity of the order. In large enterprises, work is usually carried out by two teams in two shifts.

Generally, production cycle has the following timing distribution (for molds of medium complexity and size):

  • production of design documentation - 4-7 days;
  • order of mold blocks (and delivery) - 7-12 days;
  • simultaneously to the step above - the order of steel forming - 5-8 days;
  • the manufacture of mold - 7-10 days;
  • heat treatment - 3-5 days;
  • machining of standard blocks - 3-5 days;
  • assembly - 2-3 days;
  • together with the FOT/SOT procedures and surface finishing of tooling - 26-42 days.

Almost every company specialized in mold making and technological rigging is able to design and manufacture a mold for the production of complex plastic products that meet the high requirements of the consumers.

These are the advantages that all KVOTA’s customers receive when they cooperate with us. Additionally, our clients receive our free consultancy, profound expertise, and a high quality of the products.

We would be happy to cooperate and are opened for your questions. The last ones could be send to our email: kvotatr@gmail.com

Ttime to manufacture

Виберіть своє місто
Вибір міста допоможе зберегти більше вільного часу для вас!

Запрос отправлен. Мы обязательно Вам перезвоним.

×
Узнать цену
Your Name:*
Телефон:
E-mail: *
×
Request a call
Your Name:*
Your phone number:*

Запрос отправлен. Мы обязательно Вам перезвоним.

×
Сообщение
×